A floating factory for the Masvlakte 2 caisson breakwater:

by S. Mann

Institution: Delft University of Technology
Department:
Degree:
Year: 1999
Keywords: reusable caissons; breakwater design; construction technology
Posted:
Record ID: 1264378
Full text PDF: http://resolver.tudelft.nl/uuid:841bb0d2-fa8f-4b9c-a5ec-4ad900c9ac0a


Abstract

It is foreseen that the future expansion of the Port of Rotterdam will face the problem of lack of space. A typical Dutch solution to create the necessary area for harbour and industrial terrain, is reclamation of land from the sea. This can be achieved by expanding Maasvlakte I with Maasvlakte 2. The exact amount of required terrain is subject to many elements which are continuously changing such as political, economical, environmental and social views, and therefore is very difficult to predict accurately. A solution to meet this uncertainty, is to create the Maasvlakte 2 in several phases. By maintaining a flexible planning of the reclamation, the expansion works can be adapted to changed views if necessary. The construction works of the Maasv lakte 2 are very extensive, and consist of 3 main elements, the terrain itself which is to be created, sea-defence works which must protect the terrain against inundation and erosion, and a breakwater, which must reduce the height of the incoming waves from the North sea to an acceptable level in order to give access for shipping to the harbour under storm conditions and limit downtime of the harbour activities. For the phased execution of Maasvlakte 2, sections of the newly gained terrain must be protected against the sea by a breakwater during each phase. As breakwaters are very expensive structures, a flexible breakwater, a breakwater which can be reused several times, might be economical. Caissons are an ideal alternative for such a breakwater as these can be brought afloat again and repositioned at a new location. The caisson dimensions have been determined using the Goda design formulas to calculate the wave forces on vertical walls and the wave transmission over the caisson, and the formulas of rinchHanssen to calculate the bearing capacity of the soil layers. These formulas have been implemented in the computer program 'Outer Caisson Dimensions', (O.e.D. ) written in this study. This program indicates that for the conditions of the future Maasvlakte 2 breakwater site, slip of the subsoil is the decisive failure mode. Construction of the caissons will be on a floating construction yard moored in the Europe Harbour of the Maasvlakte I equipped with slip formwork. The main advantage of the floating caisson construction method is that there is no need of an expensive construction dock or specialised lifting equipment. When the caisson is completed, it is moored at a temporary location where it is trimmed for stability and prepared for transport to the breakwater site. The caissons are towed to the breakwater construction site by tugs, and are lowered onto the foundation by flooding the cells. Finally the cells are filled with sand, concrete capping plates are placed, and the rocks of the rubble mound bottom protection are placed. The caissons can be considered as building blocks, easily reusable components of the Maasvlakte 2 breakwater. For caisson reuse, the capping plates must be removed and the sand content of the cells replaced with ballast water. When the caisson…

Add abstract

Want to add your dissertation abstract to this database? It only takes a minute!

Search abstract

Search for abstracts by subject, author or institution

Share this abstract

Relevant publications

Book cover thumbnail image
Another Boom for Amazonia? Examining the Socioeconomic and Environmental Impl...
by Penn, Jr., James W.
   
Book cover thumbnail image
Informalisation as a Strength Community Survival Systems and Economic Developmen...
by Meintjies, Frank
   
Book cover thumbnail image
Private and Public Sector Collaboration in Guam’s ... Is Guam Prepared for the Future?
by Schumann, Fred R.
   
Book cover thumbnail image
Sermons, Systems and Strategies The Geographic Strategies of the Methodist Episcop...
by Nickerson, Michael G.
   
Book cover thumbnail image
Modeling Carbon Fluxes, Net Primary Production, an...
by Goetz, Scott J.